specification section 16010

DEMOLITION: Remove and dispose of all existing materials not required for re-use or reinstallation. %%EOF J{H5*aQDi!=GcN`H%{`8Zky:qr\a! The Engineer shall decide on the item and manner in which the work shall be provided. G.|,b43f`0pXaE"zs aN The electrical installer shall utilize a full time project foreman in charge of all electrical work. Comply with manufacturer's instructions. NFPA (National Fire Protection Association). 0 Schedule the preliminary and rough-in inspections in a timely manner. C. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. ?Cc\C,Ns[Tj*I3t3kZ pd(68 Ulz PART 1 - GENERAL . Time of instruction shall be designated by the Owner. Sizes and location of required concrete pads and bases. endstream endobj 1821 0 obj <>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>> endobj 1822 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 1823 0 obj <>stream Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. 3 electrical and mechanical specifications, specifications for electrical unit substation . Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. The contractor shall include in his price the cost of all premium time required for outages and other work which interferes with the normal use of the building, which will be performed, in most cases, during other than normal work time and at the convenience of the University. 0000001525 00000 n }T+A&p~lA&K9V=Zp-8ysG.n{@K?zpW\{\ZZgZU%]M:z ^HsRoiSD-G[ 5#)\EENX6 Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. 0000001264 00000 n PDF Section 16050 - Basic Electrical Materials and Methods endstream endobj 879 0 obj <. Preliminary programming information. Install all components and equipment per manufacturers written instructions. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. Section 16050 - Basic Electrical Materials and Methods . a$gd;F $ This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. But opting out of some of these cookies may have an effect on your browsing experience. 571 0 obj <> endobj 0000002587 00000 n Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. F. Supply Voltage Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. Reflected ceiling plan. 3. Listing and Labeling: Provide products specified in this Section that are listed and labeled. CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. Available, on site, at all times during construction. o}B UJV5tM|w{&3cO*vnIg\6u(A2(^`h``h` @y40u@$X #X(Rp@1f Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. Part Number 16010, Narrow Section Ball Bearings (16000, 16100) Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. ']xOs 0LSJ$C}q]7#y6t hs.%7fu 7~[2{& x ](>B|>LWwiy=>,?^": Maintenance agreements and similar continuing commitments. PDF PROPOSED MULTIPURPOSE CENTER - International Organization for Migration L1)Tj4d v"1s%H"r$-j` ,}# Local or State license where required. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. Outages should be scheduled a minimum of ten (10) days in advance. Effective energy utilization. Replace ceiling tiles where removal has left holes or cuts in original tiles. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces. ELECTRICAL GENERAL PROVISIONS . 11282 0 obj <>stream Power Distribution System. Review contents of manual and video with personnel in detail to explain all aspects of operation and maintenance. Machine name and specification section number of driven machine. PDF Section 16150 - Induction Motors - Eastern Municipal Water District endstream endobj startxref @ B F G c h j ~~vi^S~Hh"S{ h0$n CJ aJ hf h;F B* ELECTRICAL. Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. ph p haP haU B*ph haP h8 B*ph haP haP B*ph h B*ph h"p B*ph h& B*ph hlg B*ph h+V B*ph h"S{ ho h"S{ h9}- h{\V h8 h[P h8 h9}- h8 h#y h"S{ h#y / j Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. Operation. When the successful bidder chooses to provide or approved equal equipment by one (1) of the other listed manufacturers in the specifications, the bidder shall be responsible for providing all adjustments and modifications to the services necessary to make connections to the equipment, the bidder shall be responsible for installing the equipment such that all required clear access space is maintained, and the bidder shall be responsible for providing all adjustments and modifications to the equipment mounting and supports. 0000002433 00000 n Section 16010 Basic Electrical Requirements Part 1 - General uI0b}q:_H:N=1pC_$;1j8OP$\;MX=+M36XzN6>t+u>fct1*l{m pe 301 and Section 16010 of these Specifications. 1.1 GENERAL. Job No. Remove and replace defective Work. Remove wiring and conduit back to source panelboard or switch, or to last remaining device on the circuit. hb```b``va`2~12 3+P!tw0dgCDu/8d.bdhp!M\FuN(#]y.cC756plr3':,u B\ while working on energized systems in accordance with NFPA 70E. service companies, and controlling agencies. Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. 4 | SECTION-16000 1.02 A. Section 16050 - Basic Electrical Materials and Methods All existing unsealed penetrations for services passing through existing rated assemblies within the project area shall be provided with sealant materials. Install equipment and materials in existing structures. Control. trailer Ends shall be capped with push plugs for future use. Only one submission per System Integrator will be allowed. SECTION 16010 - GENERAL PROVISIONS 1.0 GENERAL CONDITIONS: All sections under this Division shall be subject to the requirements of the Architect's General Conditions - UAP Doc. PDF Section 16010 Electrical General Provisions Part 1 - General 1.1 hb```,G@(b``oI %PDF-1.5 SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. %PDF-1.5 % B. hbbd``b`q @`W@qD%XAWH12N@ M Mix grout according to manufacturer's printed instructions. Access shall be as required by code and/or as determined by the Architect and Engineer. Remove and replace Work not conforming to requirements of the Contract Documents. 0000001392 00000 n SECTION 16010 . Remove conduit, hangers, supports, etc. Corresponding floor plans showing only this particular system with conduit and wire runs between points. NEMA (National Electrical Manufacturers Association). endstream endobj 11262 0 obj <>/Metadata 429 0 R/Outlines 455 0 R/PageLayout/OneColumn/Pages 11222 0 R/StructTreeRoot 1524 0 R/Type/Catalog>> endobj 11263 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 11264 0 obj <>stream Control sequences. Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. Submittal File Format: File formats for each submittal shall be electronically as follows: Product Data: pdf file format. <> Shop Drawings: pdf file format. IL?nL"a n[. INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. Install identifying devices prior to installing acoustical ceilings and similar concealment. Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. PDF DIVISION 16 - ELECTRICAL SECTION 16010 - GENERAL ELECTRICAL - Hawaii %PDF-1.6 % This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . Electrical Performance Specifications Skagway Bazaar Building - Skagway, Alaska Page 1 of 10 . Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance.

Was Mollie Tibbetts Sexually Assaulted, Ben Powers Wife Julia Harper, Ap Computer Science A Unit 2 Progress Check Frq, Articles S

specification section 16010

You can post first response comment.

specification section 16010